Kitchen Renovation Cost in Kuala Lumpur: What to Budget in 2026

Short answer: published Malaysian renovation guides put a kitchen renovation at roughly RM10,000 to RM100,000, depending on the size of the room, the cabinets and how much of it is being rebuilt. A light refresh sits near the low end. A full rebuild with new cabinets, tiling, wiring and plumbing sits much higher. This guide explains what drives that gap so you can budget with fewer surprises.

Last updated: 20 November 2026

What decides your kitchen renovation cost

Two kitchens of the same size can have very different quotes. These are the factors that move the number most:

  • Scope of work. Replacing cabinet doors and a countertop is a different job from stripping the room to bare walls and starting again.
  • Cabinets. Made-to-measure cabinets are usually the largest single item. Length, carcass material, door finish and countertop all change the price.
  • Layout changes. Moving the sink or cooker means new piping, new electrical points and more hacking. Keeping the existing layout is the easiest way to hold the budget down.
  • Wet and dry works. Hacking old tiles, waterproofing, new floor and wall tiles, ceiling work and repainting all add up.
  • Fittings and appliances. Sink, tap, hob, hood and exhaust fan vary widely by brand.
  • Site access. Condo lift bookings, working-hour limits and debris removal can add time and cost.

Typical kitchen renovation prices in Malaysia (2026)

The figures below come from published Malaysian guides (listed under Sources). Contractors measure differently, so one may price cabinets per foot run and another per square foot. Use these as a ballpark, then compare real quotes on the same scope.

Item Typical range Source
Whole kitchen renovation RM10,000 to RM100,000 PropertyGuru
Hacking and demolition RM2,000 to RM3,000 per area PropertyGuru (iDFAC Engineering)
Melamine kitchen cabinets RM200 to RM450 per foot run PropertyGuru (iDFAC Engineering)
Melamine kitchen cabinets, another guide RM450 to RM720 per sq ft Qanvast
Kitchen island RM700 to RM800 per sq ft Qanvast
Floor and wall tiles, supplied and laid RM11 to RM24 per sq ft PropertyGuru, Qanvast
Electrical point RM65 to RM90 per point; 13A socket RM100 to RM150 PropertyGuru, Qanvast
New plumbing piping RM350 to RM550 per point PropertyGuru
Plaster ceiling RM3.50 to RM7 per sq ft Qanvast, PropertyGuru
Sink and tap RM150 to RM300 Qanvast
Kitchen exhaust fan RM150 to RM350 Qanvast
LED strip light for cabinets About RM30 per foot run Qanvast

These are third-party estimates, not FS Renovation quotes. Your price depends on your layout, materials and access.

How to read a kitchen renovation quote

A good quote lets you compare like with like. Before you sign, check that it:

  1. Is itemised. Cabinets, countertop, tiling, wiring, plumbing and painting should each have their own line.
  2. States how cabinets are measured. Per foot run and per square foot are not the same, so ask which one is used.
  3. Names the materials and brands. Carcass, door finish, countertop, sink, tap and hob should be specified, not left as “supply”.
  4. Covers hacking and debris disposal. These are often missed in a first quote.
  5. Includes concealment and making good. Electrical points for downlights or fans may need extra concealment and plastering. Confirm it is included.
  6. Sets a payment schedule and timeline in writing. Payments should follow progress, not be paid all upfront.

Ways to save without cutting corners

  • Keep the sink and cooker where they are. Moving wet points adds piping, hacking and making good.
  • Finalise the layout before work starts. Changes halfway through are the most common source of extra charges.
  • Spend where it is hard to redo. Waterproofing, wiring, plumbing and the cabinet structure are costly to fix later. Handles, taps and lighting are easy to upgrade.
  • Compare quotes on the same scope sheet. Send every contractor the same list so the prices mean the same thing.
  • Consider phasing. If the budget is tight, do the structural and wet works first and add extras such as an island later.

Keep a buffer for surprises

PropertyGuru suggests setting aside 10 to 20 percent of the total budget as contingency, and remembering costs that are easy to forget, such as permits and professional fees. In older units, hidden issues often appear once old tiles come off, so a buffer is worth having.

Condo or landed house: what changes

In a condominium you generally need consent from the management corporation (MC) and have to follow the building rules on working hours, lift protection and debris. For a terrace or other landed house you have more freedom, but any change that removes walls or alters the structure needs written approval from the local authority under the Street, Drainage and Buildings Act 1974. A kitchen refresh that keeps walls and layout usually avoids this. Check with your MC or local council before you start.

Getting a kitchen quote from FS Renovation

FS Renovation handles kitchen renovation across Kuala Lumpur, Selangor and the Klang Valley, including cabinets, countertops, tiling, plumbing and wiring under one team. We start with a free site visit and give you an itemised written quote, so you can see where every ringgit goes. See our kitchen renovation service, browse recent projects, or read our guide to terrace house renovation in Kuala Lumpur if you are planning a bigger job.

Want a clear number for your kitchen?

Send us your kitchen size and a few photos, or book a free site visit.

WhatsApp usRequest a free site visit

Frequently asked questions

How much does a kitchen renovation cost in Kuala Lumpur?

Published Malaysian guides give a wide range of about RM10,000 to RM100,000 for a kitchen renovation. A light refresh costs less. A full rebuild with new cabinets, tiling, wiring and plumbing costs much more. The cabinets, layout changes and finishes you choose decide where you land. A site visit and an itemised quote give the only reliable number.

How much do kitchen cabinets cost in Malaysia?

One guide lists melamine kitchen cabinets at about RM200 to RM450 per foot run, and another lists RM450 to RM720 per square foot. The units differ, so ask your contractor how they measure and compare quotes on the same basis. A kitchen island is quoted higher, at about RM700 to RM800 per square foot in one guide.

How long does a kitchen renovation take?

It depends on the scope. A light refresh is quicker. A full rebuild takes longer because hacking, wet works and tiling come first, and made-to-measure cabinets are made after the room is measured and installed afterwards. Ask your contractor for a written schedule before work starts.

Do I need approval to renovate a kitchen in a condo?

Usually yes. Condominiums generally require consent from the management corporation (MC) and follow building rules on working hours and debris. Work that removes walls or changes the structure also needs written approval from the local authority. Check your MC rules before you book a contractor.

How much extra budget should I keep for a kitchen renovation?

Set aside 10 to 20 percent of your total budget as contingency. Hidden problems, such as damaged waterproofing or old piping, often show up once the old kitchen is stripped out.

Sources

Scroll to Top