Short answer: published Malaysian guides put a typical terrace house renovation at about RM50,000 to RM150,000, while another guide estimates RM180,000 to RM220,000 for a complete renovation of a terrace home. The gap comes down to scope: a kitchen and bathroom upgrade is a very different job from rebuilding the whole interior. This guide covers costs, approvals and the order to do the work, so you can plan before you hire anyone.
Last updated: 20 November 2026
What a terrace house renovation usually includes
Terrace houses are narrow, deep and share walls with neighbours, so most projects fall into one of these levels:
- Refresh. Repainting, new lighting, floor touch-ups and minor carpentry.
- Kitchen and bathroom upgrade. The rooms that cost the most per square foot and age the fastest.
- Full interior renovation. New layout, ceilings, wiring, plumbing, tiling, cabinets and paint across every floor.
- Extension or structural change. Rear extensions, wall removal or a new floor. This needs approval before work starts.
Terrace house renovation cost in Malaysia
Costs vary a lot because “renovation” covers such different amounts of work. These benchmarks come from published Malaysian guides (see Sources):
| What | Typical range | Source |
|---|---|---|
| Terrace house, whole project | RM50,000 to RM150,000 | PropertyGuru |
| Terrace house, complete renovation estimate | RM180,000 to RM220,000 | Qanvast |
| Condominium, for comparison | RM40,000 to RM150,000 or more | PropertyGuru |
| Kitchen | RM10,000 to RM100,000 | PropertyGuru |
| Bathroom | RM5,000 to RM50,000 | PropertyGuru |
| Living room and bedrooms | RM10,000 to RM70,000 | PropertyGuru |
| Exterior and landscaping | RM10,000 to RM100,000 or more | PropertyGuru |
PropertyGuru also gives a rule of thumb of RM20 to RM150 or more per square foot overall, and about RM120 to RM200 per square foot for mid-range work. These are third-party estimates, not FS Renovation quotes. For a closer look at one room, see our kitchen renovation cost guide.
The right order to renovate a terrace house
Doing the work in the wrong order means redoing finished surfaces. A sensible sequence is:
- Plan and get approvals. Fix the layout, scope and budget first.
- Hacking and demolition. Remove old tiles, walls and fittings you are replacing.
- Structural and wall works. Rebuild or add walls where needed.
- Plumbing and electrical. Run new piping and wiring while walls and floors are open.
- Waterproofing. Treat wet areas and test before tiling.
- Ceiling and plastering. Close up the services and level the surfaces.
- Tiling. Lay floor and wall tiles.
- Carpentry and cabinets. Install built-ins after the wet works are done.
- Painting. Paint last to avoid damage from other trades.
- Fittings, cleaning and defect check. Walk through every room and list anything to fix.
Permits and approvals
Not every job needs approval, but some do. According to PropertyGuru, significant works such as removing walls, adding lofts or extensions, or changing the facade need written approval from the local authority under the Street, Drainage and Buildings Act 1974. These jobs often need plans from an architect or engineer. Smaller works such as tiling, fences or awnings may fall under a minor construction work permit.
In Kuala Lumpur, approvals from DBKL are valid for one year and can be renewed. Other councils have their own rules and fees, so check directly with yours before you start. If the work touches a shared party wall, tell your neighbours early. It avoids disputes and delays.
Challenges that are specific to terrace houses
- Narrow frontage and access. Moving materials through a small gate and a long, narrow house takes planning.
- Shared walls. Noisy works such as hacking affect neighbours, so agree working hours.
- Older wiring and piping. Houses of a certain age often need rewiring or new pipes. It is cheaper to do this while the walls are open.
- Light and ventilation. Deep plans can feel dark in the middle. Think about skylights, open layouts and rear openings early.
- Rear and front extensions. These usually need approval and a clear plan for drainage.
Choosing a contractor and signing the contract
PropertyGuru recommends hiring CIDB-registered contractors or certified designers, asking for a fixed-cost proposal, and getting a written contract. Your contract should cover:
- The full scope of work, room by room
- The timeline with start and finish dates
- A payment schedule tied to progress
- Penalties for delay
- Materials and brands for key items
Budget buffer and phasing
Keep 10 to 20 percent of your total budget as contingency, and include permits, engineering reports and professional fees. If the full budget is not available at once, phase the job. Do structural, wiring, plumbing and waterproofing first, then finishes and built-in furniture as funds allow.
How FS Renovation can help
FS Renovation takes on terrace house renovation across Kuala Lumpur and Selangor, from kitchens and bathrooms to full interiors. We start with a free site visit and give an itemised written quote. Explore our terrace house renovation service, interior renovation, toilet renovation and kitchen renovation, or see recent projects.
Tell us the area, the rooms you want to change and your timing. We will arrange a free site visit.
Frequently asked questions
How much does it cost to renovate a terrace house in Malaysia?
Published guides give about RM50,000 to RM150,000 for a typical terrace house project, and one guide estimates RM180,000 to RM220,000 for a complete renovation. The range is wide because scope varies from a kitchen and bathroom upgrade to a full interior rebuild. Get an itemised quote after a site visit.
Do I need a permit to renovate a terrace house in Kuala Lumpur?
Only for some work. Removing walls, building extensions or lofts, or changing the facade needs written approval from the local authority, often with architect or engineer plans. Minor works like tiling may need a minor construction work permit. Check with DBKL or your local council before you start.
What should I renovate first in a terrace house?
Start with planning and approvals, then hacking, structural work, plumbing and wiring, waterproofing, ceilings, tiling, carpentry and painting last. Doing the hidden services first avoids damaging finished surfaces later.
How much contingency should I set aside for a house renovation?
Keep 10 to 20 percent of your total budget as contingency. Also budget for permits, engineering reports and professional fees, since these are often forgotten.
Can I renovate a terrace house in phases?
Yes. Do the structural, wiring, plumbing and waterproofing first, then add finishes and built-in furniture later. Phasing spreads the cost, but plan the full layout first so early work does not need to be redone.